All Projects
Case Study Project

Blue Mountain Village Exterior Envelope Development

Project Type Commercial
Location Collingwood, ON
Completed 2018
Style Traditional
Colour Family Multi-Colour
Project Details Arches, Cornices, Decorative Features, Keystones, Mouldings, Multi-Clad, Window Trim

Divisions Involved In Project

Division 1

EIFS / Stucco

System Used Drainage EIFS S6-EF-01
ManufacturerDurcok
Specific Product UsedPUCCS
TexturesMarble Coat 1.5
ColoursBM 2001-10 (Ruby Red), BM 2165-50 (Natural Sand)
Overview

System 6 Group completed a large-scale exterior envelope package within Blue Mountain Village, one of Ontario's premier four-season resort destinations. The project included the installation of EIFS wall assemblies and cement board soffit systems finished with architectural stucco coatings across multiple residential and mixed-use buildings within the village development. The village is a landmark destination known for its pedestrian streets, accommodations, retail, dining, and resort facilities.

Challenge

The scale of the project required extensive coordination across multiple buildings, elevations, and construction phases. Architectural details, varying wall conditions, and high-visibility public-facing façades demanded consistent workmanship and quality control throughout the installation process.

Solution / Process

System 6 deployed dedicated crews to maintain production efficiency while ensuring consistent installation standards across the development. Through careful coordination with site management and other trades, the EIFS and soffit systems were completed to provide a durable, energy-efficient, and visually cohesive exterior finish throughout the project.

Explore Similar Projects
Planning a similar project?

Let System 6 help define the right exterior system.

Request a Quote